Tongshan Qiaozhong Trading Co., Ltd.

Six Joint Shop Rounds

Mortise work, read as a single coordinated system

Tongshan Qiaozhong Trading Co., Ltd. runs its Xianning shop to six defined rounds, each one handing a written result to the next. Together they carry a frame from the first bench cut through survey, season, chisel check and the final line watch, so nothing about the build depends on memory alone.

Joint Bench

The Joint Bench is the first round and the reference for everything that follows. On the bench, the mortise is cut to gauge and the tenon is pared to fit by hand, with each pair test-dry before it is released to the frame schedule. Our crew records the cut depth, the shoulder line and the fit note for every joint, so the rest of the project can compare against a checked reference instead of an assumption.

Because the joint shop treats timber assemblies as an integrated system, the bench is never run in isolation. The crew reads the survey drawing on the wall, sets the reference size for the whole run, and keeps the first fitted pair aside as a physical standard. When a later tenon feels tight or loose, the bench pair settles the question in minutes.

Frame Survey Days

Frame Survey Days bring the bench discipline to the site. A two-person survey team reads the footing, the wall line and the beam seat against the drawing set, checking each dimension before any timber is lifted into place. The day closes with a written frame sheet that flags deviation early, while a correction still costs a few hours rather than a rebuilt bay.

The survey team works in sequence with the bench schedule, so the frame that arrives on site has already been planned against the readings taken there. Where a site reading differs from the drawing, the survey day produces a short change note that travels back to the Joint Bench before the next cut is made.

Beam Season Weeks

Beam Season Weeks are the scheduled rest periods we give green timber before it is worked to final dimension. Each beam settles under a controlled load while the season log tracks moisture and movement week by week. By the time a beam returns to the bench, it has reached a stable state, and the joint it receives will hold its fit as the frame dries.

The season is not idle time; it is planned time. We set the rest window against the build calendar, so the beam stabilises exactly when the bench is ready for it. The log also becomes part of the client record, letting anyone see when a beam was stacked, how it moved and why it was cleared for the final cut.

Chisel Check Rounds

Chisel Check Rounds send a finish hand over every cut face to confirm the joint sits square, flush and free of bruising at the shoulders. Each round returns a short pass or fail note per joint, and any fail is corrected before the fitting schedule moves on. The chisel check is the quality gate that separates a cut joint from a finished one.

These rounds also catch the small drift that builds across a long run, where a tenth of a millimetre at the bench can become a visible gap after assembly. A finish hand reads that drift early, tightens the paring and keeps the whole frame consistent, joint after joint, into the last bay.

Line Watch Sessions

Line Watch Sessions keep a surveyor on the chalk line during the lift, reading plumb and level as the frame closes and calling any drift while it can still be corrected by hand. Each session logs line readings at set intervals, so the assembled frame is verified against its own record rather than judged by eye at the end of the day.

The line watch works alongside the lifting crew, not after it. Because the surveyor reads the frame as it goes together, a single out-of-level seat is caught before the next beam lands, and the assembled structure closes square to the line established on the survey day.

Shop Evenings

Shop Evenings open the bench to clients, who can bring a joint, watch a test fit and talk through a beam plan with the crew in person. The evening keeps the system transparent, because anyone can see the cut, the fit and the record side by side, and questions about a schedule are answered against the actual work.

These evenings also serve the crew, giving the bench team room to review the coming week of survey days and season windows with the people who will stand under the finished frame. The result is a joint shop that stays accountable, open and aligned around the same system from the first evening to the last hand-over.

Process Overview

From bench standard to verified line

01

Set the standard

The Joint Bench produces the reference pair that fixes the fit for the whole run.

02

Read the site

Frame Survey Days check footing, wall line and seat against the drawing set.

03

Let the timber settle

Beam Season Weeks stabilise green beams under load before the final dimension.

04

Gate every joint

Chisel Check Rounds confirm each cut face sits square, flush and free of bruising.

05

Watch the line

Line Watch Sessions hold the lift to plumb and log readings at set intervals.

06

Open the bench

Shop Evenings close the loop, letting clients review the work and the record together.

Book a survey day or reserve a beam season window with the shop.

Contact the joint shop